Analysis of crack development in loess deep filled ground based on physical modelling tests
-
摘要:
裂缝是高填方工程中常见病害,常规手段难以精准预测裂缝的发育情况。为指导黄土高填方工程的抗裂缝设计,以陕北某黄土高填方工程中的典型沟谷断面为原型,采用土工离心模型试验预测黄土高填方场地潜在裂缝,结合现场监测方法,揭示裂缝产生机制,并调查分析工程场地内裂缝的孕裂环境、启裂条件、破裂过程,评估离心模型试验预测裂缝发育的有效性,提出适用于黄土高填方场地的裂缝防控措施。离心模型试验结果显示,不均匀沉降、水平位移会引起沟谷地形中的黄土高填方场地在挖填交界带内发育裂缝;离心模型试验与原型现场监测结果显示,原型与离心模型试验的裂缝分布位置相对应,填土厚度差异引起的不均匀沉降和朝向沟谷中心的水平位移产生的拉剪联合作用是裂缝产生的主要原因。
Abstract:Cracks are a common issue in deep filled construction projects, and conventional methods often struggle to accurately predict their development. To guide the anti-crack design for deep-filled loess projects, a prototype of a typical gully section from a northern Shaanxi project was selected. Geotechnical centrifuge model tests were utilized to predict potential cracks in the loess fill, with the cracking mechanisms elucidated through combined field monitoring. The study also investigates the conditions conducive to cracking, the fracture initiation of cracks, and the fracture processes within the project site. The effectiveness of using centrifuge model tests for predicting crack development was evaluated, and measures suitable for preventing and controlling cracks in high loess fill sites were proposed. The results indicate that uneven settlement and horizontal displacement cause cracks to develop in the excavation-fill boundary zone within gully terrain. Both centrifuge model tests and prototype field monitoring demonstrate that crack distributions in the prototype correspond to those in the tests, with differential fill thickness and horizontal displacement towards the center of the gully primarily responsible for the formation of cracks.
-
Keywords:
- loess /
- deep filled ground /
- cracks /
- centrifuge model test /
- field monitoring
-
0. 引言
近年来,西部黄土丘陵沟壑区为增加城市、机场、工业等建设用地,开展了大量黄土高填方工程。黄土高填方场地由于跨越不同地质单元,原始地形变化大、地质条件复杂、岩土软硬不同,填方薄厚不均,土方填筑完成后,场地中常有裂缝发育。当地表水沿裂缝下渗时,会使裂缝带附近地基产生显著的潜蚀、湿陷和软化等复杂的物理和化学变化过程,进一步加剧裂缝发育,使地表产生不均匀沉降,若不加以处理,将成为工程的安全隐患,引发地面设施的差异变形和开裂破坏,这无疑是黄土高填方工程十分关心的问题。因此,认清黄土高填方场地内裂缝的发育特征和分布规律,是裂缝防治的基础。
地裂缝是一种由多种因素引起的地表岩层或土体开裂,并在地面形成一定长度和宽度裂缝的宏观破坏现象,严重时会成为一种地质灾害[1]。各领域对地裂缝研究的侧重点不同,如工程地质领域对裂缝的研究工作主要集中在新构造活动引起的裂缝[2]、采矿区塌陷引起的裂缝[3]、平原区抽取地下水引起的裂缝[4]等;岩土工程领域对裂缝的研究主要集中在边坡[5-6]、土石坝[7-10]和路基[11-12]等工程。在黄土高填方工程中,近年来国内学者围绕高填方场地变形[13]、挖填边坡稳定性[14]、地下水环境变化[15]等做了大量研究工作,但鲜有关于黄土高填方场地裂缝的实测资料和分析研究成果。本文基于陕北某黄土高填方场地裂缝的实测资料,分析了裂缝的发育特征、分布规律和时间变化,相关成果可为裂缝防治提供科学依据,为黄土高填方地基技术标准的制订提供参考。
1. 工程概况
某黄土高填方工程地处陕北黄土丘陵沟壑区,属于为增加城镇建设用地开展的大面积造地工程,一期规划面积10.5 km2,南北向长度约5.5 km,东西向宽度约2.0 km,挖方体积约为2.0×108 m3,填方体积约为1.6×108 m3,最大挖方厚度约为118 m,最大填方厚度约为112 m。本工程自2012年4月17日起开工建设,2012年11月15日—2013年3月15日为冬歇停工期,至2013年10月底土方施工陆续完工,施工期历时约1.5年。
1.1 地质结构特征
典型的黄土高填方场地剖面示意图如图1所示。黄土高填方场地是由“三面”(原地基表面、填筑体表面和挖填边坡面)、“二体”(原地基体和填筑体)、“二水”(地下水和地表水)构成的特殊地质体,受原始沟谷地形影响,填土厚度差异较大,沟谷中部的填土厚度大,由沟谷底部向斜坡方向逐渐变薄。
1.2 地质条件概况
本工程原始场地受构造剥蚀作用,呈“U”形或“V”形,地貌单元属黄土粱、峁、沟壑地带。场地内主要出露地层为第四系、新近系和侏罗系,其中:第四系包括全新统洪积层粉土、上更新统马兰黄土、中更新统离石黄土;新近系岩性为棕红色、暗紫色黏土,含大量钙质结核,半胶结;侏罗系岩性为砂岩、泥岩互层。
1.3 工程措施概况
本工程沿原沟谷沟底设置了树枝状的地下盲沟排水系统,将地下水引出场外,控制地下水位稳定。原地基沟谷区的淤积土、湿陷性黄土、松散堆积物和沟谷斜坡接茬部位均采用强夯法处理。填筑体采用分层碾压法(冲击碾压、振动碾压)处理,填料主要来自于黄土梁峁区挖填线以上各土层,主要为上更新统黄土及古土壤、中更新统黄土及古土壤,压实质量采用重型击实试验控制,控制标准为压实系数不小于0.93。
2. 裂缝的监测与探测
本次对本工程试验场地内的裂缝进行监测与探测,采取的方法及测点布置情况如下:
(1)裂缝表面特征测量:本工程试验场地土方填筑完成后,笔者自2013年11月中旬开始,对场地进行全区域巡视观察,并采用GPS-RTK、测尺对长度超过1 m、宽度超过5 mm的裂缝位置、长度和宽度进行了测量记录。
(2)裂缝内部特征探测:采用高密度电法探测典型裂缝发育区域地表下裂缝(含伴生落水洞)的发育情况,测试仪器为DUK-2A60,测试工作参照《水利水电工程物探规程》[16],间隔系数为19,收敛系数设1,有效电极数为60个,采用温纳四极工作模式,测线上电极间距均为4 m。
(3)裂缝表面宽度监测:本次除在裂缝两侧设置固定标志点,采用钢尺测量标志点间的相对位移外,为了实现对裂缝宽度变化的自动化监测,设计了一种电测式裂缝宽度监测装置,该装置由位移计、位移传递杆、套管、伸缩波纹管、扶正导向器、锚固板和数据自动采集传输系统等组成,其结构如图2所示,各组件说明如下:
①位移计:采用电感调频式位移传感器,量程为400 mm,精度为1‰FS.。
②位移传递杆:采用外径26.9 mm无缝钢管加工,位移传递杆与锚固板连接。
③套管:采用外径53 mm的测斜管加工,内壁带有十字导槽。
④伸缩波纹管:采用内径为55 mm的金属波纹管,波纹管纵向能自由伸缩,外套于套管上,将套管与周围土体分开,防止泥土进入套管内。
⑤扶正导向器:由导向杆和导向轮组成,长度为50 cm,导向轮由扭簧撑开,导向轮位于导槽内,使位移传递杆位于套管轴线。
⑥锚固板:采用直径300 mm、厚度5 mm的钢板加工,由水泥砂浆浇筑到安装槽两端的坑槽中,使锚固板与裂缝两侧土体成为一体。
⑦数据自动采集传输系统:由数据采集控制模块、无线传输模块、太阳能供电系统、监控中心服务器等组成。
本裂缝宽度监测装置的工作原理是:当裂缝宽度变化时,土层将带动锚固板同步变形,裂缝两侧锚固板之间发生相对位移,位移传递杆将相对位移传递给位移计进行测量,位移计前后两次测量值之差即为裂缝表面宽度的变化量。
试验场地于2013年11月15日起进入冬歇期停工,2013年12月14日在场地巡察时发现1B-LF1号裂缝,2013年12月17日在该裂缝处安装了裂缝表面宽度监测装置,裂缝宽度监测点布置情况如图3所示。
如图3所示,1B-LF1号裂缝上共设置了7组监测点,除监测位置LFJC-2采用电测式裂缝宽度监测装置外,其余监测位置均通过钢尺测量裂缝两侧固定标志点间的相对位移变化,其中监测位置LFJC-0与LFJC-2用于对比两种监测方法的观测效果,二者之间水平相距0.4 m。裂缝表面宽度的监测工作,自2013年12月22日开始至2014年3月15日复工后结束。
3. 裂缝发育特征与分布规律
3.1 裂缝的发育特征
试验场地中出现的裂缝有干缩裂缝、冻融裂缝、沉降裂缝等,其中干缩裂缝、冻融裂缝都发生浅表层,裂缝的长度较短和深度较浅,对工程影响很小,而沉降裂缝发育较多,且在地表下一定深度,对工程影响较大。试验场地内的典型沉降裂缝照片如图4所示。典型裂缝形态与组合如图5所示。由图5可知,场地内裂缝的形态主要为直线状、弧线状、波纹状和分叉状等,平面组合方式主要有侧列式、侧现式和断续式等形式。
通过实地调查发现,裂缝的裂口呈上宽下窄的尖楔形,壁面粗糙不平,两壁无明显错动迹象,部分裂缝下部被上部风干或脱落的土颗粒填充,从地面肉眼可见部分出露深度一般不超过2 m,但其向下部延伸可能更深。由于黄土高填方场地中的裂缝带土体松散破碎,孔隙较大,当有地表水入渗时,裂缝带容易形成冲沟或低洼地带,而这些负地形又成为地表水的汇聚点和入渗的优势通道,为此,一些地势较低的区域,裂缝有时会伴生有塌陷落水洞。试验场地中某典型裂缝及伴生落水洞的现场照片如图6所示。为了查明该典型裂缝(含伴生落水洞)在地下的延伸情况,本次采高密度电法对该裂缝的内部发育特征进行探测,探测线的布设情况如图7所示。
如图7所示,除测线CX4完全在挖方区外,其它测线CX1、CX2、CX3、CX5、CX6均跨越挖方区和填方区。图8为高密度电法反演电阻率剖面图。由CX1~CX6测线的反演电阻率值范围统计可知,挖方区电阻率范围一般为10~50 Ω·m,填方区电阻率变化范围一般为40~90 Ω·m,填方区电阻率总体高于挖方区。CX4测点无高阻异常区,表明该测线的地下无明显裂缝带或落水洞发育;CX1、CX3、CX5、CX6在浅部地层(深度5 m范围内)有向上开口的密集、高阻半闭合圈;CX2测线横穿裂缝延伸线,当向地下供电探测时,电流线在距起点50~70 m,深度0~10 m范围内,产生强烈的排斥作用,存在明显的高阻异常区,其电阻率达到90~186 Ω·m,反映在地电剖面上电阻率等值线为闭合高阻圈。根据类似工程场地的探测经验,可初步判定该区域地面下可能存在隐伏落水洞,后经人工洛阳铲探测证实,6.5~7.5 m处土层明显松散,洛阳铲头易于贯入。
综合各测线的电阻率测试结果可知,裂缝及伴生的隐伏落水洞(或松散填充体)主要沿原沟谷与填筑体接茬面顺谷坡发育,发育区域主要集中在测线CX1、CX3之间与测线CX4、CX6之间的各测线交汇形成四边形范围内,作为未来裂缝及其伴生落水洞采用强夯法处理的重点区域,强夯影响深度应不小于8.0 m。
3.2 裂缝的分布规律
截止2014年8月13日,试验场地内共发现沉降裂缝84条,其中最长的裂缝延伸达283 m,最大缝宽达52 mm。裂缝的统计分析结果显示,分布在填方区的裂缝占总数的94%,而分布在挖方区的裂缝仅占总数的6%。裂缝数量在不同填土厚度区间的分布情况如图9所示。填方厚度为0~5 m、5~10 m、10~15 m、15~20 m和>20 m区间内的裂缝数量分别占裂缝总数量的63.3%、25.3%、6.3%、0%和5.1%。通过统计填方区裂缝与挖填交界线距离,得到裂缝数量在不同距离区间的分布情况如图10所示。裂缝与挖填分界线距离为0~5 m、5~10 m、10~15 m、15~20 m和>20 m区间内的裂缝数量分别占裂缝总数量的19.0%、25.3%、15.2%、12.7%和27.9%。裂缝延伸长度的统计情况如图11所示。裂缝延展长度主要集中在0~60 m,以20~40 m为最多(占裂缝总数的40%),其余裂缝以20 m为差值区间,发育数量大致相当,裂缝的平均长度约49 m。各裂缝最大张开宽度的统计结果如图12所示。由图可知,裂缝宽度普遍较小,其中宽度在5~15 mm的裂缝,超过总数的一半,裂缝的最大宽度约为52 mm,平均约为21 mm。
基于上述统计结果可知,裂缝主要发生在挖填分界线填方区一侧,填方厚度小于15 m以及距离挖填分界线20 m以内的条带状区域内,且以挖填交界面过渡带(挖填厚度≤5 m)范围为主。从裂缝分布及地形资料分析发现,裂缝的空间分布、发育时间和发育产状具有如下特点:
(1) 成带性:裂缝在空间分布上集中分布在挖填交界过渡带,在原地基地形变化较大的地段一般会出现主干裂缝和伴生裂缝组成的裂缝带。
(2) 时效性:根据现场调查发现,填方竣工或阶段性停工初期(一般是1个月后开始出现)是裂缝高发期,这时填方区会有较大的差异沉降,裂缝多在该时段集中出现,且有持续开裂、相互贯通的趋势。随着地基变形逐步稳定,因差异沉降引起的裂缝,出现的数量逐步减少。此外,由于填筑区域范围大,工段多,工作面分散,各工作面起始填筑标高不一,不可避免的存在工作面搭接,工作面搭接部位因填筑时序不同,产生差异沉降,形成的裂缝仅在施工停歇期出现,竣工后尚未发现。
(3) 方向性:裂缝发育产状与原地基地形有明显的对应关系,裂缝倾向大致与原沟谷坡体倾向近乎垂直,裂缝走向几乎与挖填界线或原地基等高线基本一致,并随原沟谷斜坡地形曲折变化。
3.3 裂缝表面宽度的变化规律
典型裂缝表面宽度的历时曲线如图13所示。由图可知,监测位置LFJC-0与LFJC-2的监测结果基本一致,表明设计的裂缝宽度监测新装置的测试结果可靠。裂缝表面宽度在停工初期变化较快,约1个月后裂缝表面宽度增大速率明显降低,并逐步趋于稳定。监测区域的裂缝表面宽度变化规律表明,裂缝从出现到趋于缓慢需要约3个月时间,在此期间,裂缝两侧的差异沉降增大较快,对应裂缝宽度也将持续增大,若过早的对裂缝进行处理,则反而会因该区域的沉降尚未稳定,显露裂缝大概率会再次出现。因此,在裂缝处理前应防止地表水沿缝汇集下渗,宜待裂缝宽度基本稳定后,再对裂缝发育区域采取强夯处理。
3.4 裂缝形成机制的探讨
黄土高填方场地的沉降变形由原地基沉降和填筑体沉降两部分组成。原地基沟谷中存在人工填土层、湿陷性黄土层和淤积土层等,虽然经过夯实处理,但在上覆大厚度填土荷载作用下,仍会产生较大的固结压缩沉降。填筑体为非饱和土,采取分层填筑施工,在自重压力的作用下会产生压密沉降,虽然施工期已完成大部分沉降变形,但工后期仍会有工后沉降。
试验场地内某典型沟谷横断面的工后沉降曲线如图14所示。图中沟谷横断面方向的回填土厚度由沟谷中心向斜坡方向逐步减小,对应沟谷横剖面方向的沉降变形从沟中线向沟谷两侧逐步减小,呈现出中间大、两边小的盆腔形态,在挖方区甚至有回弹变形。沟谷形的黄土高填方场地,虽然沿原沟谷中心向沟谷两侧原地基体土层厚度逐步增大,但填土厚度逐步减小,中部沉降仍大于两侧,表明高填方沉降量主要受填土厚度控制。前人以沟谷地形中黄土高填方场地为原型,开展的大型离心模型试验结果显示[17]:填筑体浅层变形较深层变形更为明显,填筑体顶面沉降基本呈现下“凹”弯沉盆形式;远离沟谷斜坡处的填土厚度相对均匀,填土变形以竖直方向沉降为主,而靠近沟谷斜坡位置,土体还会发生指向沟谷中心方向的水平位移。上述变形特征,会使挖填交界带附近产生较大的拉张应力,当拉张应力超过土体的抗拉强度后,最终导致挖填交接带附近形成裂缝(图15)。
4. 结论
(1) 沟谷地形中的黄土高填方场地裂缝在平面形态上可分为直线状、弧线状、波纹状、交叉状等,裂缝的空间分布具有成带性,发育时间具有时效性,发育产状具有方向性等特点。
(2) 裂缝主要分布于填方厚度小于15 m及距离挖填分界线20 m以内的区域内,以挖填交界过渡带(挖填厚度≤5 m)为主,裂缝走向与挖填界线或原地基的等高线近似一致。
(3) 典型裂缝的高密度电法探测结果显示,试验场地裂缝及伴生的隐伏型落水洞主要沿原谷坡与填筑体接茬面发育,对其进行强夯处理时,强夯影响深度不应少于8 m。
(4) 试验场地的裂缝出现在土方填筑施工停止1个月后,裂缝宽度增大速率逐渐降低,从出现到趋于稳定约需3个月时间,因此建议处理时机选择在裂缝宽度变化趋于稳定后实施。
(5) 沟谷地形、填土厚度变化引起的差异沉降和沟谷两侧填土发生朝向沟谷中心的水平位移,导致挖填交界带土体内产生的拉张力超过土体抗拉强度,是裂缝产生的主要原因。
-
表 1 模型对应原型的表面沉降统计结果
Table 1 Statistical results of surface settlement for the model corresponding to the prototype
值 别 LDS1 LDS2 LDS3 LDS4 LDS5 LDS6 LDS7 原型填土厚度/m 112 112 86.4 67.2 48 32 32 总沉降/mm 2609 2806 2671 1961 1174 284 354 施工期沉降占比/% 77.1 79.1 79.8 75.9 77.3 51.4 77.4 变形倾度/% / LDS1~LDS2 LDS2~LDS3 LDS3~LDS4 LDS4~LDS5 LDS5~LDS6 LDS6~LDS7 0.82 0.53 3.70 4.10 5.56 0.44 表 2 离心模型试验中土压力观测结果
Table 2 Observations of soil pressure during the centrifuge model experiment
测点编号 E1 E2 E4 E5 E6 E7 模型中水平方向距离/cm 20 20 90 20 50 20 对应原型中水平方向距离/m 32 32 144 32 80 32 模型中埋深/cm 10 20 40 60 对应原型中埋深/m 16 32 64 96 计算值/kPa 296 591 591 1183 1183 1774 观测值/kPa 352 564 720 920 1225 1545 -
[1] 闫芙蓉,范文,邓龙胜,等. 地表水沿裂缝带入渗对路基路面的影响[J]. 长安大学学报(自然科学版),2010,30(2):34 − 38. [YAN Furong,FAN Wen,DENG Longsheng,et al. Influence of water seeping fracture and fissure on subgrade and pavement[J]. Journal of Chang’an University (Natural Science Edition),2010,30(2):34 − 38. (in Chinese with English abstract)] DOI: 10.3969/j.issn.1671-8879.2010.02.008 YAN Furong, FAN Wen, DENG Longsheng, et al. Influence of water seeping fracture and fissure on subgrade and pavement[J]. Journal of Chang’an University (Natural Science Edition), 2010, 30(2): 34 − 38. (in Chinese with English abstract) DOI: 10.3969/j.issn.1671-8879.2010.02.008
[2] 赵文博,曹佳文,郭长宝,等. 甘肃岷县阳坡村大型古滑坡发育特征与稳定性评价[J]. 地质通报,2024,43(10):1869 − 1880. [ZHAO Wenbo,CAO Jiawen,GUO Changbao,et al. Developmental characteristics and stability simulation of Yangpo Village large-scale ancient landslides in Minxian County, Gansu Province[J]. Geological Bulletin of China,2024,43(10):1869 − 1880. (in Chinese with English abstract)] ZHAO Wenbo, CAO Jiawen, GUO Changbao, et al. Developmental characteristics and stability simulation of Yangpo Village large-scale ancient landslides in Minxian County, Gansu Province[J]. Geological Bulletin of China, 2024, 43(10): 1869 − 1880. (in Chinese with English abstract)
[3] 薛强,张茂省,董英,等. 基于DEM和遥感的黄土地质灾害精细化风险识别——以陕北黄土高原区米脂县为例[J]. 中国地质,2023,50(3):926 − 942. [XUE Qiang,ZHANG Maosheng,DONG Ying,et al. Refinement risk identification of loess geo-hazards based on DEM and remote sensing:Taking Mizhi County in the Loess Plateau of northern Shaanxi as an example[J]. Geology in China,2023,50(3):926 − 942. (in Chinese with English abstract)] XUE Qiang, ZHANG Maosheng, DONG Ying, et al. Refinement risk identification of loess geo-hazards based on DEM and remote sensing: Taking Mizhi County in the Loess Plateau of northern Shaanxi as an example[J]. Geology in China, 2023, 50(3): 926 − 942. (in Chinese with English abstract)
[4] 王云强,张少康,张萍萍,等. 黄土高原关键带土壤水文过程研究进展与展望[J]. 地质通报,2024,43(8):1346 − 1360. [WANG Yunqiang,ZHANG Shaokang,ZHANG Pingping,et al. Research progress and prospect of soil hydrological processes in critical zone of the Loess Plateau[J]. Geological Bulletin of China,2024,43(8):1346 − 1360. (in Chinese with English abstract)] WANG Yunqiang, ZHANG Shaokang, ZHANG Pingping, et al. Research progress and prospect of soil hydrological processes in critical zone of the Loess Plateau[J]. Geological Bulletin of China, 2024, 43(8): 1346 − 1360. (in Chinese with English abstract)
[5] 于永堂,郑建国,张继文,等. 黄土高填方场地裂缝的发育特征及分布规律[J]. 中国地质灾害与防治学报,2021,32(4):85 − 92. [YU Yongtang,ZHENG Jianguo,ZHANG Jiwen,et al. Development and distribution characteristics of ground fissures in high loess filled ground[J]. The Chinese Journal of Geological Hazard and Control,2021,32(4):85 − 92. (in Chinese with English abstract)] YU Yongtang, ZHENG Jianguo, ZHANG Jiwen, et al. Development and distribution characteristics of ground fissures in high loess filled ground[J]. The Chinese Journal of Geological Hazard and Control, 2021, 32(4): 85 − 92. (in Chinese with English abstract)
[6] 马翔,赖国泉. 某山区机场高填方滑坡变形特征分析[J]. 中国地质灾害与防治学报,2019,30(4):16 − 23. [MA Xiang,LAI Guoquan. Analysis on deformation monitoring of a high fill landslide in a mountain airport[J]. The Chinese Journal of Geological Hazard and Control,2019,30(4):16 − 23. (in Chinese with English abstract)] MA Xiang, LAI Guoquan. Analysis on deformation monitoring of a high fill landslide in a mountain airport[J]. The Chinese Journal of Geological Hazard and Control, 2019, 30(4): 16 − 23. (in Chinese with English abstract)
[7] 毛正君,于海泳,梁伟,等. 基于无人机倾斜摄影测量三维建模的区域黄土滑坡识别及特征分析[J]. 中国地质,2024,51(2):561 − 576. [MAO Zhengjun,YU Haiyong,LIANG Wei,et al. Identification and feature analysis of regional loess landslides based on UAV tilt photogrammetry 3D modeling[J]. Geology in China,2024,51(2):561 − 576. (in Chinese with English abstract)] MAO Zhengjun, YU Haiyong, LIANG Wei, et al. Identification and feature analysis of regional loess landslides based on UAV tilt photogrammetry 3D modeling[J]. Geology in China, 2024, 51(2): 561 − 576. (in Chinese with English abstract)
[8] 陈林万,裴向军,张晓超,等. 不同压实度下黄土填方边坡失稳的模型试验研究[J]. 水文地质工程地质,2022,49(2):137 − 147. [CHEN Linwan,PEI Xiangjun,ZHANG Xiaochao,et al. A model test study of the instability of loess fill slope under different compactness[J]. Hydrogeology & Engineering Geology,2022,49(2):137 − 147. (in Chinese with English abstract)] CHEN Linwan, PEI Xiangjun, ZHANG Xiaochao, et al. A model test study of the instability of loess fill slope under different compactness[J]. Hydrogeology & Engineering Geology, 2022, 49(2): 137 − 147. (in Chinese with English abstract)
[9] 余岱金,黄强兵,康孝森,等. 黄土填方边坡界面渗流破坏机制模型试验研究[J]. 水文地质工程地质,2022,49(5):119 − 128. [YU Daijin,HUANG Qiangbing,KANG Xiaosen,et al. A model test study of the interface seepage and failure mechanism of loess-filled slope[J]. Hydrogeology & Engineering Geology,2022,49(5):119 − 128. (in Chinese with English abstract)] YU Daijin, HUANG Qiangbing, KANG Xiaosen, et al. A model test study of the interface seepage and failure mechanism of loess-filled slope[J]. Hydrogeology & Engineering Geology, 2022, 49(5): 119 − 128. (in Chinese with English abstract)
[10] 俞清荣. 高填方路基纵向裂缝的预防及处理措施[J]. 路基工程,2011(2):166 − 168. [YU Qingrong. Prevention and treatment measures of longitudinal cracks in high fill subgrade[J]. Subgrade Engineering,2011(2):166 − 168. (in Chinese with English abstract)] DOI: 10.3969/j.issn.1003-8825.2011.02.053 YU Qingrong. Prevention and treatment measures of longitudinal cracks in high fill subgrade[J]. Subgrade Engineering, 2011(2): 166 − 168. (in Chinese with English abstract) DOI: 10.3969/j.issn.1003-8825.2011.02.053
[11] SHERARD JAMES L. Embankment dam cracking[C]. Geotechnical Special Publication. New York:ASCE,1992:131 − 215.
[12] WANG J D,XU Y J,MA Y,et al. Study on the deformation and failure modes of filling slope in loess filling engineering:A case study at a loess mountain airport[J]. Landslides,2018,15(12):2423 − 2435.
[13] 刘守华,董津城,徐光明,等. 地下断裂对不同土质上覆土层的工程影响[J]. 岩石力学与工程学报,2005,24(11):1868 − 1874. [LIU Shouhua,DONG Jincheng,XU Guangming,et al. Influence on different overburden soils due to bedrock fracture[J]. Chinese Journal of Rock Mechanics and Engineering,2005,24(11):1868 − 1874. (in Chinese with English abstract)] DOI: 10.3321/j.issn:1000-6915.2005.11.009 LIU Shouhua, DONG Jincheng, XU Guangming, et al. Influence on different overburden soils due to bedrock fracture[J]. Chinese Journal of Rock Mechanics and Engineering, 2005, 24(11): 1868 − 1874. (in Chinese with English abstract) DOI: 10.3321/j.issn:1000-6915.2005.11.009
[14] 李青云,濮家骝,殷昆亭,等. 防渗墙施工引起堤防裂缝的离心模型试验研究[J]. 清华大学学报(自然科学版),2002,42(4):543 − 545. [LI Qingyun,PU Jialiu,YIN Kunting,et al. Analysis of levee cracking during diaphragm wall construction using centrifuge model tests[J]. Journal of Tsinghua University (Science and Technology),2002,42(4):543 − 545. (in Chinese with English abstract)] LI Qingyun, PU Jialiu, YIN Kunting, et al. Analysis of levee cracking during diaphragm wall construction using centrifuge model tests[J]. Journal of Tsinghua University (Science and Technology), 2002, 42(4): 543 − 545. (in Chinese with English abstract)
[15] SHCHERBINA V I,OLYMPIEV D N. Numerical and centrifugal modeling of cracking in an earth-and-rockfill dam core[C]//Francis G. McLean. Centrifuge 91. Nether- lands:Balkema A A,1991,67 − 72.
[16] 朱维新. 用离心模型研究土石坝心墙裂缝[J]. 岩土工程学报,1994,16(6):82 − 95. [ZHU Weixin. Study on cracks in core wall of earth-rock dam with centrifugal model[J]. Chinese Journal of Geotechnical Engineering,1994,16(6):82 − 95. (in Chinese with English abstract)] DOI: 10.3321/j.issn:1000-4548.1994.06.010 ZHU Weixin. Study on cracks in core wall of earth-rock dam with centrifugal model[J]. Chinese Journal of Geotechnical Engineering, 1994, 16(6): 82 − 95. (in Chinese with English abstract) DOI: 10.3321/j.issn:1000-4548.1994.06.010
[17] 张丙印,张美聪,孙逊. 土石坝横向裂缝的土工离心机模型试验研究[J]. 岩土力学,2008,29(5):1254 − 1258. [ZHANG Bingyin,ZHANG Meicong,SUN Xun. Centrifugal modeling of transverse cracking in earth core dams[J]. Rock and Soil Mechanics,2008,29(5):1254 − 1258. (in Chinese with English abstract)] DOI: 10.3969/j.issn.1000-7598.2008.05.020 ZHANG Bingyin, ZHANG Meicong, SUN Xun. Centrifugal modeling of transverse cracking in earth core dams[J]. Rock and Soil Mechanics, 2008, 29(5): 1254 − 1258. (in Chinese with English abstract) DOI: 10.3969/j.issn.1000-7598.2008.05.020
[18] 牛起飞, 侯瑜京, 梁建辉, 等. 坝肩变坡引起心墙裂缝和水力劈裂的离心模型试验研究[J]. 岩土工程学报,2010,32(12):1935 − 1941. [NIU Qifei, HOU Yujing, LIANG Jianhui, et al. Centrifuge modeling of cracking and hydraulic fracturing in core dams induced by abrupt change of bank slope[J]. Chinese Journal of Geotechnical Engineering,2010,32(12):1935 − 1941. (in Chinese with English abstract)] NIU Qifei, HOU Yujing, LIANG Jianhui, et al. Centrifuge modeling of cracking and hydraulic fracturing in core dams induced by abrupt change of bank slope[J]. Chinese Journal of Geotechnical Engineering, 2010, 32(12): 1935 − 1941. (in Chinese with English abstract)
[19] 濮家骝. 土工离心模型试验及其应用的发展趋势[J]. 岩土工程学报,1996,18(5):96 − 98. [PU Jialiu. Geotechnical centrifuge model test and its application development trend[J]. Chinese Journal of Geotechnical Engineering,1996,18(5):96 − 98. (in Chinese)] PU Jialiu. Geotechnical centrifuge model test and its application development trend[J]. Chinese Journal of Geotechnical Engineering, 1996, 18(5): 96 − 98. (in Chinese)
[20] 国家质量技术监督局,中华人民共和国建设部. 土工试验方法标准:GB/T 50123—1999[S]. 北京:中国计划出版社,1999. [Ministry of Construction of the People’s Republic of China. Standard for soil test method:GB/T 50123—1999[S]. Beijing:China Planning Press,1999. (in Chinese)] Ministry of Construction of the People’s Republic of China. Standard for soil test method: GB/T 50123—1999[S]. Beijing: China Planning Press, 1999. (in Chinese)
[21] 蒋关鲁,胡润忠,李安洪. 离心模型试验预测中等压缩性土地基沉降的可行性[J]. 交通运输工程学报,2011,11(6):17 − 23. [JIANG Guanlu,HU Runzhong,LI Anhong. Feasibility of predicting settlement of medium compression soil foundation with centrifuge model tests[J]. Journal of Traffic and Transportation Engineering,2011,11(6):17 − 23. (in Chinese with English abstract)] JIANG Guanlu, HU Runzhong, LI Anhong. Feasibility of predicting settlement of medium compression soil foundation with centrifuge model tests[J]. Journal of Traffic and Transportation Engineering, 2011, 11(6): 17 − 23. (in Chinese with English abstract)
[22] 章为民,徐光明. 土石坝填筑过程的离心模拟方法[J]. 水利学报,1997,28(2):8 − 13. [ZHANG Weimin,XU Guangming. Study on modeling the construction process of embankment dams in centrifugal test[J]. Journal of Hydraulic Engineering,1997,28(2):8 − 13. (in Chinese)] DOI: 10.3321/j.issn:0559-9350.1997.02.002 ZHANG Weimin, XU Guangming. Study on modeling the construction process of embankment dams in centrifugal test[J]. Journal of Hydraulic Engineering, 1997, 28(2): 8 − 13. (in Chinese) DOI: 10.3321/j.issn:0559-9350.1997.02.002
[23] 中华人民共和国行业标准编写组. 土工离心模型试验规程:DL/T 5012—1999[S]. 北京:中国电力出版社,2013. [The National Standards Compilation Group of People's Republic of China:DL/T 5012—1999[S]. Beijing:China Electric Power Press,2023. (in Chinese)] The National Standards Compilation Group of People's Republic of China: DL/T 5012—1999[S]. Beijing: China Electric Power Press, 2023. (in Chinese)
[24] 杨雪强,何世秀,庄心善. 土木工程中的成拱效应[J]. 湖北工学院学报,1994,9(1):1 − 7. [YANG Xueqiang,HE Shixiu,ZHUANG Xinshan. Arch forming effect in civil engineering[J]. Journal of Hubei University of Technology,1994,9(1):1 − 7. (in Chinese with English abstract)] YANG Xueqiang, HE Shixiu, ZHUANG Xinshan. Arch forming effect in civil engineering[J]. Journal of Hubei University of Technology, 1994, 9(1): 1 − 7. (in Chinese with English abstract)
[25] 陆士强. 填土的断裂机理[J]. 岩土工程学报,1980,2(2):20 − 25. [LU Shiqiang. The mechanism of fracture of compacted soils[J]. Chinese Journal of Geotechnical Engineering,1980,2(2):20 − 25. (in Chinese with English abstract)] DOI: 10.3321/j.issn:1000-4548.1980.02.003 LU Shiqiang. The mechanism of fracture of compacted soils[J]. Chinese Journal of Geotechnical Engineering, 1980, 2(2): 20 − 25. (in Chinese with English abstract) DOI: 10.3321/j.issn:1000-4548.1980.02.003
[26] 李广信. 高等土力学[M]. 2版. 北京:清华大学出版社,2016. [LI Guangxin. Advanced soil mechanics second edition[M]. 2nd ed. Beijing:Tsinghua University Press,2016. (in Chinese)] LI Guangxin. Advanced soil mechanics second edition[M]. 2nd ed. Beijing: Tsinghua University Press, 2016. (in Chinese)
[27] 中国工程建设标准化协会. 黄土高填方场地与地基技术规程:T/CECS 1430—2023[S]. 北京:中国计划出版社,2023. [China Association for Engineering Construction Standardization. Technical specification for loess high fill site and foundation:T/CECS 1430—2023[S]. Beijing:China Planning Press,2023. (in Chinese)] China Association for Engineering Construction Standardization. Technical specification for loess high fill site and foundation: T/CECS 1430—2023[S]. Beijing: China Planning Press, 2023. (in Chinese)
-
期刊类型引用(4)
1. 刘阳,王飞永,贺鸣,赵玺. 表水侵蚀地裂缝物理模型试验研究. 工程地质学报. 2024(01): 183-193 . 百度学术
2. 刘振华,何付兵,崔玉斌,刘晓勇,王凯,张悦泽,赵艳英. 平谷地裂缝基本特征与成因分析. 科学技术与工程. 2023(04): 1436-1446 . 百度学术
3. 孟振江,彭建兵,李超,乔建伟,王飞永,康尘云,赵俊彦,张凡. 耦合型地裂缝活动特征与成因机制模拟研究——以北京宋庄地裂缝为例. 水文地质工程地质. 2023(03): 138-148 . 百度学术
4. 王晗,邓亚虹,慕焕东,薛捷. 西安典型地裂缝场地地脉动测试及地震响应特征分析. 中国地质灾害与防治学报. 2022(04): 55-64 . 本站查看
其他类型引用(1)